China High-rise Glass Curtain Wall Demolition, Replacement, and Installation Project for Office Buildings - China Supplier China High-rise Glass Curtain Wall Demolition, Replacement, and Installation Project for Office Buildings - China Supplier China High-rise Glass Curtain Wall Demolition, Replacement, and Installation Project for Office Buildings - China Supplier China High-rise Glass Curtain Wall Demolition, Replacement, and Installation Project for Office Buildings - China Supplier

High-rise Glass Curtain Wall Demolition, Replacement, and Installation Project for Office Buildings

Price:Negotiable
Industry Category: Construction-Real-Estate
Product Category:
Brand:
Spec:


Contact Info

Other Products

Description
Additional Information

High-Rise Office Building Glass Curtain Wall Removal and Installation Project – Sichuan Wanqiang Building Curtain Wall Engineering Co., Ltd.

I. Pre-Construction Preparation (Sichuan Wanqiang Building Curtain Wall Engineering Co., Ltd. – Glass Curtain Wall Maintenance Company)

  1. Detailed Survey and Plan Design: A professional team must conduct a comprehensive survey of the office building's glass curtain wall, recording details such as glass specifications, models, degree of damage, frame structure condition, and the surrounding building environment. Based on the survey results, a scientific and reasonable removal, replacement, and installation plan is formulated, including construction sequence, tools to be used, and safety protection measures.
  1. Material Procurement and Quality Control: Strictly procure glass, frame materials, sealants, etc., in accordance with design requirements. The glass should possess good strength, thermal insulation, and sound insulation properties, while frame materials must be corrosion-resistant and high-strength. Conduct rigorous quality inspections on each batch of materials entering the site to ensure compliance with national standards and project requirements.
  1. Personnel Training and Safety Briefing: Provide professional training to all personnel involved in the construction, including skills for working at heights, construction procedures, and safety precautions. Before construction begins, conduct a detailed safety briefing to ensure every worker clearly understands the risks involved and the corresponding response measures.

II. Implementation of Removal Work (Chengdu High-Rise Glass Curtain Wall Removal, Replacement, and Installation Company – Sichuan Wanqiang Building Curtain Wall Engineering Co., Ltd.)

  1. Safety Protection Setup: Establish safety warning zones around the office building and set up protective sheds to prevent falling objects from causing injuries during the removal process. Additionally, erect scaffolding or use professional gondolas outside the glass curtain wall to provide a safe working platform for construction personnel.
  1. Removal Sequence and Methods: Follow the sequence of first removing sealant strips, then the glass, and finally the frame. Use professional tools to carefully dismantle the components, avoiding damage to the surrounding structure. For larger glass panels, employ equipment such as cranes to assist in the removal, ensuring the process is safe and controllable.

III. Replacement and Installation Process (High-Rise Glass Curtain Wall Maintenance and Repair Services – Sichuan Wanqiang Building Curtain Wall Engineering Co., Ltd.)

  1. Frame Installation and Adjustment: Install the new frame structure, ensuring its verticality and levelness meet design requirements. Apply anti-corrosion treatment to the frame to enhance its durability. During installation, use measuring instruments for real-time monitoring to ensure precision.
  1. Glass Installation and Sealing: Accurately install the glass that meets specifications into the frame, and use sealant for sealing to ensure good sealing performance and prevent water leakage and air penetration. During glass installation, take care to protect the glass surface to avoid scratches.
  1. Quality Inspection and Adjustment: After installation is complete, conduct a comprehensive quality inspection of the glass curtain wall, including visual inspection, sealing performance testing, and structural strength checks. Promptly adjust and repair any issues found to ensure all performance aspects of the glass curtain wall meet design standards.

IV. Project Safety Assurance

  1. Safety Measures for Working at Heights: Construction personnel must wear personal protective equipment such as safety harnesses and helmets, with safety harnesses attached high and used low. When working on scaffolding or gondolas, ensure the equipment is stable and secure, and conduct regular safety inspections.
  1. Fire Safety Assurance: Equip the construction site with sufficient firefighting equipment, establish fire safety protocols, and strictly prohibit smoking and open flames on site. Regularly inspect electrical equipment to prevent electrical fires.
  1. Emergency Plan Formulation: Develop a detailed emergency plan addressing potential incidents such as falls from heights, fires, and object strikes, clearly outlining emergency response procedures and rescue measures. Conduct regular emergency drills to enhance the emergency response capabilities of construction personnel.

Sichuan Wanqiang Building Curtain Wall Engineering Co., Ltd. – Office Building High-Rise Glass Curtain Wall Removal and Installation Company


Industry Category Construction-Real-Estate
Product Category
Brand:
Spec:
Stock:
Origin: China / Sichuan / Chengdushi
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192